Interface: Polk City Police Department - Polk City Public Works Department

Polk City Police Department to Polk City Public Works Department Interface Diagram

Information Flow Definitions

current infrastructure restrictions  (Existing)  

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

maint and constr resource request  (Existing)  

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Existing)  

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

maint and constr work plans  (Existing)  

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

roadway maintenance status  (Existing)  

Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).

work plan feedback  (Existing)  

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.